Uploaded image for project: 'Project Configurator - Development'
  1. Project Configurator - Development
  2. PCDEV-868

Allow for data import between different versions of Jira

    Details

    • Type: New Feature
    • Status: Done (View Workflow)
    • Priority: High
    • Resolution: Fixed
    • Affects Version/s: 2.4.1-J7
    • Fix Version/s: 2.4.3
    • Labels:
      None

      Description

      Now PC can be enabled to import complete projects from an instance running a different version of Jira than the target. This will save time and provide a lot of extra flexibility to users.

      This feature can be enabled by checking the "Allow data import from different Jira versions" radio button at the "Import complete project" page, as shown in this image:

      Please note, that importing data from different Jira versions might eventually lead to not all information being imported or other import problems. This risk would be greater as the difference between the source and target version becomes larger. If this option is enabled, the plugin will display a warning about this risk.

        Attachments

          Issue Links

            Structure

              Activity

                People

                Assignee:
                jrojo Jose Rojo [X] (Inactive)
                Reporter:
                pmaranon Pepe Maranon Mora
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                  Dates

                  Created:
                  Updated:
                  Resolved:

                    Structure Helper Panel